Malone MPG107MD Manuel d'utilisateur Page 3

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 6
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 2
MALONE
R
Installation & Loading Instructions - MPG107M (MD) SeaWing
. Place the straps parallel to the carriers with the
front strap loop on the windshield and the rear
strap loop on the back of the vehicle.
See image 8.
. Position kayak so that the cockpit is evenly centered
between the front and rear carriers. The bottom of
the kayak should be slightly elevated above each of
the carriers and held by the sides of the carriers.
See image 10.
. Place the strap loops over the kayak so that
each loop is positioned directly over a carrier.
See image 11.
TM
8
10
11
9
. Place a mat on the rear of the vehicle to
protect the finish. Lift the front of the
kayak onto the vehicle. Lift the rear of
the kayak up and slide it into the carriers.
See image 9.
Vue de la page 2
1 2 3 4 5 6

Commentaires sur ces manuels

Pas de commentaire